Sign In or Register to view pricing and more.
Documents & Guides
No Documents Available
125A 4T RL OU 27974, ****Customer must confirm local utility or metering/power distribution approval for the metering and power distribution equipment prior to installation. Seller makes no warranty of utility acceptance.****
Overview
125A 4T RL OU 27974, ****Customer must confirm local utility or metering/power distribution approval for the metering and power distribution equipment prior to installation. Seller makes no warranty of utility acceptance.****
Also known as: 784572279742, UAP7487-RL-TG-KK
Specifications
| Standards: | California Proposition 65 |
| Standards: | California Proposition 65 |