This product may not be available in all locations.

to view pricing and more.
CPE250 Station (62.5 kW)- includes Express 250 Station,2x Pwr Modules, 1x CCS1 200A cable,1x CHAdeMO cable, N ModemA/SIM, cUL, CPE250-CMT-IMPERIAL/METRIC not included, Includes: E99-002664, E99-004710, E99-004710, EX0290-01. Must be Certified ChargePoint to installl. Annual software plan and one-time activation fee required.
Overview
CPE250 Station (62.5 kW)- includes Express 250 Station,2x Pwr Modules, 1x CCS1 200A cable,1x CHAdeMO cable, N ModemA/SIM, cUL, CPE250-CMT-IMPERIAL/METRIC not included, Includes: E99-002664, E99-004710, E99-004710, EX0290-01. Must be Certified ChargePoint to installl. Annual software plan and one-time activation fee required.
Also known as: 786687094951, E0-000057
Specifications
No Specifications Available