
Sign In or Register to view pricing and more.
Documents & Guides
4 TERM RNGLS SML CLS PLT 1-200 AMP MN BRKR STATE OF MAINE, ****Customer must confirm local utility or metering/power distribution approval for the metering and power distribution equipment prior to installation. Seller makes no warranty of utility acceptance.****
Overview
4 TERM RNGLS SML CLS PLT 1-200 AMP MN BRKR STATE OF MAINE, ****Customer must confirm local utility or metering/power distribution approval for the metering and power distribution equipment prior to installation. Seller makes no warranty of utility acceptance.****
Also known as: 784572138179, U3491-XL-200
Specifications
| Amps: | 200 |
| Mounting: | Surface |
| Phase: | 1 |
| Standards: | California Proposition 65 |
| Amps: | 200 |
| Phase: | 1 |
| Mounting: | Surface |
| Standards: | California Proposition 65 |